Please reload

Recent Posts

Dredge tests in flume tank at Memorial University

October 18, 2017

1/1
Please reload

Featured Posts

First Berg´s Dredge (Sea Cucumber dredge) Ready for Testing

February 24, 2018

We now have our first sea cucumber dredge built from scaled blueprints. The design is built on previous development with a few more implementations such as rubber sleeve on the mouth piece and a sensor bracket. The dredge was given the name Berg´s dredge in honor of our captain Bergur Garðarsson who has been the leading captain in the development in the fishing of sea cucumber around Iceland since the start of fishing in 2003. The dredge will now bee tested on fishing along side of the other dredges our ship Klettur has been operating with and later this summer a comparison test between the traditional ski dredges and Berg´s dredge will be conducted with the Marine and Freshwater Research Institute.

 

 

Share on Facebook
Share on Twitter
Please reload

Follow Us
Please reload

Search By Tags
Please reload

Archive
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

    © Aurora Seafood